Real modular wall formwork panels with steel frames and clamps — illustrative image

OUR SERVICES · DUBAI

Shuttering Works

The right form. A stronger start.

Photo: Julia Taubitz / Unsplash

SHUTTERING CONTRACTOR IN DUBAI

The right form. A stronger start.

Good concrete starts before the pour. ABA PRIME delivers shuttering and formwork labour in Dubai, helping main contractors turn approved structural drawings into carefully prepared slabs, beams, walls and columns. We coordinate the workface, fixing sequence and handover so the concrete team can move forward with a clearly defined scope.

WHAT WE DO

A clearly defined
scope of work.

Every quotation starts with your drawings,
specifications and site requirements.

01

Slab & beam formwork

Erection and alignment of deck panels, beam sides and soffits to the agreed formwork arrangement. Our work is coordinated with reinforcement, openings and the planned pour sequence.

02

Columns & walls

Setting out support, assembling form faces and closing column and wall shutters to the approved dimensions. Plumb, line and access are reviewed before inspection.

03

Edges, openings & details

Formation of slab edges, construction joints and service openings shown on the issued drawings. Early coordination helps avoid disruptive adjustments close to the pour.

04

Striking & reuse

Controlled stripping, cleaning and preparation for the next cycle, following the project engineer’s release and the agreed temporary-works sequence.

Real modular wall formwork panels with steel frames and clamps — illustrative image

CAPABILITY BEHIND THE COMMITMENT

Real people.
Practical experience.

At The Central Downtown in Arjan, 30 ABA PRIME workers are assigned to shuttering and de-shuttering for ATCON Constructions LLC.

Explore our project activity

HOW WE WORK

Clarity at
every stage.

  1. 01

    Understand

    Review the structural drawings, formwork system, quantities and programme.

  2. 02

    Define

    Agree the labour scope, material responsibilities and available work fronts.

  3. 03

    Coordinate

    Sequence installation with steel fixing and MEP teams.

  4. 04

    Deliver

    Prepare for inspection, close out comments and coordinate approved striking.

BEFORE WE BEGIN

Your questions.
Answered.

Can you provide a dedicated shuttering crew?

Yes. We discuss the work fronts, formwork system and planned concrete cycle before agreeing crew size and mobilisation. Our overall workforce is 60 people; allocation is confirmed for each contract.

Do you supply the formwork materials?

Labour, formwork systems, consumables and equipment responsibilities are defined in the quotation. Send your required package so we can price the correct scope.

What do you need for a quotation?

Structural drawings, approximate formwork quantities, the proposed system, site location and target programme. If the drawings are evolving, tell us which revision should form the pricing basis.

BEFORE YOUR QUOTATION

A clearer brief.
A better starting point.

Include the drawing revision, formwork quantities, slab and wall heights, proposed system and available work fronts. Identify who supplies the panels, supports, access equipment and consumables.

LET’S DISCUSS THE DETAILS

Tell us what
you’re building.

Share your scope, location and programme. We’ll use your project information to start a focused quotation discussion.

HELP US UNDERSTAND YOUR PROJECT

Location & project type
Drawings or quantities available
Labour-only or package requirements
Target start date

Preparing your enquiry form. If the fields remain unavailable, and check your connection.

Your details will be used to respond to this enquiry. Privacy notice (opens in a new tab).

LET’S BUILD WHAT’S NEXT

Your vision.
Our commitment.